Electronic surveying improves accuracy on BIM driven hospital project

Electronic surveying improves accuracy on BIM-driven hospital project.

Electronic surveying improves accuracy on a @McCarthyBuild BIM driven hospital construction project and @SouthlandInd a mechanical contractor combines an electronic surveying tool with a BIM model to make significant productivity gains in a large-scale hospital construction project.

Using electronic surveying and BIM modeling, two-member crews were able to hit as many as 900 data points per deck per day.

Using electronic surveying and BIM modeling, two-member crews were able to hit as many as 900 data points per deck per day

hds

Leave a Reply